H100 vs H200 vs B200 vs B300: Which GPU Should You Rent?
We compare NVIDIA's data center GPUs by memory, bandwidth and use case — a practical guide to choosing the right GPU for your project.
Choosing a GPU for an AI project directly affects your budget and timeline. In this post we compare NVIDIA's four most in-demand data center GPUs from the perspective that matters when renting.
Quick comparison
| GPU | Architecture | Memory | Bandwidth | NVLink |
| --- | --- | --- | --- | --- |
| H100 SXM | Hopper | 80 GB HBM3 | 3.35 TB/s | 900 GB/s |
| H200 SXM | Hopper | 141 GB HBM3e | 4.8 TB/s | 900 GB/s |
| B200 | Blackwell | 180 GB HBM3e | 8 TB/s | 1.8 TB/s |
| B300 | Blackwell Ultra | 288 GB HBM3e | 8 TB/s | 1.8 TB/s |
Why memory matters so much
With large language models, the bottleneck is usually memory, not compute. The BF16 weights of a 70-billion-parameter model take roughly 140 GB. That model:
- must be split across at least two GPUs on H100,
- fits on a single H200, but leaves little room for the KV cache,
- runs on a single B200 or B300 with plenty of KV cache headroom for inference.
Fewer shards mean less communication overhead and simpler infrastructure.
Which one for which workload?
H100: Proven and ubiquitous
The GPU with the most mature ecosystem. A safe choice for fine-tuning, mid-scale training and production inference.
H200: Memory-bound inference
Same compute as H100, but significantly more memory and bandwidth. It can be more efficient than H100 for long-context applications and serving 70B-class models.
B200: Next-generation training
The second-generation Transformer Engine with FP4 and FP8 delivers major speed-ups for large-model training and high-throughput inference.
B300: Top-tier scale
Designed for reasoning models, very long context windows and trillion-parameter-scale models. 288 GB per GPU means more than 2.3 TB of memory in a single 8-GPU server.
Three questions to get it right
- How many parameters, and at what precision? This sets your minimum memory requirement.
- Training or inference? Training is more sensitive to GPU-to-GPU interconnect (NVLink); inference to memory bandwidth.
- For how long? Flexibility matters for projects lasting a few months; contract terms matter for long-running projects.
Not sure yet? Select "Not sure" on the quote form and we'll work out the right configuration for your workload together.